2026 Lighting Catalog

OTHER LIGHTING SOLUTIONS

NEW CONSTRUCTION LIGHTING POWER DENSITY Requirements:

• Rebates are available for new construction and major renovations where Lighting Power Density (LPD) thresholds would apply. Projects participating in this offering are NOT eligible for individual interior new construction lighting measures. • Complete the New Construction Lighting Solutions workbook. Download a copy at focusonenergy.com/catalogs. • Rebates are based on LPD requirements of current Wisconsin Energy Code, which allows the use of International Energy Conservation Code (IECC) 2021 or ASHRAE/IES 90.1-2019 with Wisconsin Amendments found in SPS Chapter 363. • All installations are expected to meet current IESNA recommendations for delivered light level and uniformity. Compliance is the responsibility of the installer designer. • Controls systems must be DLC NLC QPL listed (NLC5 or higher) and have the following Networked Lighting Controls capabilities set up and operational for individual fixtures: • Occupancy sensing. • Zoning. • Individual Addressability. • Upon project completion, the following must be included in addition to standard application requirements: • Documentation to verify square footage as-built (COMcheck or professional floorplan with dimensions). • Documentation to verify total connected wattage as-built (COMcheck or professional lighting layout indicating where fixtures are installed PLUS fixture cut sheets for all installed fixtures).

Application

Measure Description

Code Rebate

Unit

Interior New Construction Lighting Power Density (LPD) better than code requirements

N-L4948 $0.05 kWh Reduced

REMINDER As-built documentation must be provided to verify square footage and total connected wattage.

17

Powered by