B1 AIR CONDITIONING SPLIT, PACKAGED, AND AIR SOURCE HEAT PUMP SYSTEMS (≥ 5.42 TONS) REBATE CODE: H4368, H4369, H4370, H4371, H10025, H10026, H10027
PAGE 17
(C) PART LOAD EFF TO QUALIFY (IEER) (FROM MEASURE DESCRIPTION PG 18)
(B) AHRI RATED PART LOAD EFFICIENCY (IEER, 2 DECIMALS)
(A) AHRI RATED CAPACITY (TONS, 2 DECIMALS)
(G) REBATE RATE ($/TON) (E + F)
(D) DELTA EFFICIENCY (B - C)
(E) ADDITIONAL REBATE (D X $/TON)
(F) BASE REBATE ($/TON)
REQUESTED REBATE* (A X G)
EQUIP #
(Example) AC 1
15.00
16.00
15.40
0.60
$3
$30
$33
$495
B2 AIR SOURCE HEAT PUMP SYSTEM (≥ 5.42 TONS) — REBATE CODE: H10025, H10026, H10027
PAGE 18
EXISTING HEAT SOURCE (NG, ELECTRIC RESISTANCE, HEAT PUMP)
EXISTING NG THERMAL EFFICIENCY (IF APPLICABLE) (%)
EQUIP #
(Example) Boiler 1
Natural Gas
85
B3 SPLIT SYSTEM AIR CONDITIONING — CONDENSING UNIT ONLY — REBATE CODE: H3909
PAGE 18
(B) AHRI RATED FULL LOAD EFFICIENCY (EER, 2 DECIMALS)
(C) FULL LOAD EFF TO QUALIFY (EER)
(A) AHRI RATED CAPACITY (TONS, 2 DECIMALS)
(G) REBATE RATE ($/TON) (E + F)
(D) DELTA EFFICIENCY (B - C)
(E) ADDITIONAL REBATE (D X $/TON)
(F) BASE REBATE ($/TON)
REQUESTED REBATE* (A X G)
EQUIP #
(Example) AC 1
15.00
12.00
11.50 11.50 11.50 11.50
0.50
$2.50
$25
$27.50
$412.50
C1 CHILLERS (BUILDING COOLING LOAD) — REBATE CODE: H4712 – H4735
PAGES 19-20
BUILDING/SPACE DESIGN COOLING LOAD (TONS)
BASE OR TRIM CHILLER?
CHILLER LOCKOUT TEMPERATURE (°F)
CODE COMPLIANCE PATH: A OR B
EQUIP TYPE
(Example) Air-Cooled
90
Base
53 °F
Path A
C2 CHILLERS (EQUIPMENT PERFORMANCE) — REBATE CODE: H4712 – H4735
PAGES 19-20
(B) MAX FULL LOAD (KW/TON) (FROM MEASURE DESCRIPTION PG 20-21)
(D) MAX PART LOAD (IPLV) (KW/TON) (FROM MEASURE DESCRIPTION PG 20-21)
(E) AHRI RATED PART LOAD EFFICIENCY (IPLV) (KW/TON, 3 decimals)
(A) AHRI RATED CAPACITY (TONS, WHOLE NUMBER)
(C) AHRI RATED FULL LOAD EFFICIENCY (KW/TON, 3 DECIMALS)
(I) REBATE RATE ($/TON) (G + H)
(F) DELTA EFFICIENCY (B - C) + (D - E)
(G) ADDITIONAL REBATE ($/TON)
(H) BASE REBATE ($/TON)
REQUESTED REBATE* (A X I)
EQUIP #
(Example) Chiller 1
95
1.160
1.120
0.880
0.840
0.080
$10
$8
$18
$1,710
* Focus on Energy may adjust total rebate based on project caps. See measure requirements and Terms and Conditions for more information.
9
Powered by FlippingBook