C WATTS REDUCED MEASURES — REBATE CODE: L10287, L10433, L10288, L10437
22
EXISTING EQUIPMENT
NEW EQUIPMENT
WATTS REDUCED
REBATE
REBATE CODE
[F] NEW TOTAL WATTS INSTALLED [D] X [E]
[B] FIXTURE/ LAMP WATTAGE
[C] EXISTING TOTAL WATTS [A] X [B]
[E] FIXTURE/ LAMP WATTAGE
[G] TOTAL WATTS REDUCED [C] - [F]
[H] REBATE RATE ($/WATT REDUCED)
WATTS REDUCED REBATE* [G] X [H]
[A] QUANTITY
[D] QUANTITY
(Example) L10287
50
75
3,750
50
25
1,250
2,500
$0.20
$500
D1
VARIABLE FREQUENCY DRIVES (VFD) — REBATE CODE:
PAGES 15, 24-25
AG4949, AG10209, AG10210, AG3777, AG3835, AG4414, AG3836, AG4412 • Constant Torque VFD Description examples: Conveyor, Auger/Mixer, Extruder, Hoist, Positive Displacement Pump, or Other and then describe. • Controls before VFD Options: Outlet Control Valve, Bypass Valve, Discharge Damper, Inlet Guide Vanes On/Off, None, or Other and then describe. VFD DESCRIPTION CODE (SEE MEASURE DESCRIPTION PG 15, 24-25) CONTROLS BEFORE VFD EQUIPMENT OPERATING HOURS [A] HP CONTROLLED BY VFD [B] QTY [C] REBATE RATE ($/HP) REQUESTED REBATE* [A] X [B] X [C]
(Example) Irrigation Well Pump
AG4949
On/Off
700
50
1
$70
$3,500
D2 VARIABLE FREQUENCY DRIVES (VFD) — REBATE CODE: AG4949
PAGES 15, 24
APPROXIMATELY HOW OFTEN DOES YOUR WELL PUMP OPERATE TO IRRIGATE CROPS DURING PEAK DEMAND HOURS FROM 2PM-6PM, MONDAY-FRIDAY, DURING JUNE, JULY, AUGUST, SEPTEMBER? (CHECK ONE) q >90% of the time q 50%–90% of the time q 10%–50% of the time q <10% of the time D3 CONSTANT TORQUE VFD (MANUAL CONTROL) — REBATE CODE: AG3836, AG4412 PAGE 25 HOURS
HOURS AT 90% MOTOR SPEED
HOURS AT 80% MOTOR SPEED
HOURS AT 70% MOTOR SPEED
HOURS AT 60% MOTOR SPEED
HOURS AT 50% MOTOR SPEED
HOURS AT 40% MOTOR SPEED
HOURS AT 30% MOTOR SPEED
HOURS AT 20% MOTOR SPEED
HOURS AT 10% MOTOR SPEED
AT 100% MOTOR SPEED
Sum of entered hours in each cell should equal the annual operating hours entered above in Table D1.
E1 VARIABLE SPEED DRIVE (VSD) AIR COMPRESSOR — REBATE CODE: PS2196
PAGE 26
FIRST SHIFT AVERAGE SCFM
SECOND SHIFT AVERAGE SCFM
THIRD SHIFT AVERAGE SCFM
AIR COMPRESSOR OPERATING PSG
FIRST SHIFT HRS/WEEK
SECOND SHIFT HRS/ WEEK
THIRD SHIFT HRS/WEEK
WEEKEND AVERAGE SCFM
WEEKEND HRS/WEEK
TOTAL HOURS
(Example) 40 700
40
625
40
500
16
500
136
100
*Focus on Energy may adjust total rebate based on project caps. See measure requirements and Terms and Conditions for more information.
10
Powered by FlippingBook