B2 AIR SOURCE HEAT PUMP SYSTEMS (≥5.42 TONS) — REBATE CODE: H10025, H10026, H10027
PAGE 24
EXISTING HEAT SOURCE (NG, ELECTRIC RESISTANCE, HEAT PUMP)
EXISTING NG THERMAL EFFICIENCY (IF APPLICABLE) (%)
EQUIP #
(Example) Boiler 1
Natural Gas
85%
B3 SPLIT SYSTEM AIR CONDITIONING — CONDENSING UNIT ONLY — REBATE CODE: H3909
PAGE 25
(B) AHRI RATED FULL LOAD EFFICIENCY (EER, 2 DECIMALS)
(C) FULL LOAD EFF TO QUALIFY (EER) (FROM MEASURE DESCRIPTION PG 28)
(A) AHRI RATED CAPACITY (TONS, 2 DECIMALS)
(D) DELTA EFFICIENCY (B - C)
(E) ADDITIONAL REBATE (D X $/TON)
(F) BASE REBATE ($/TON)
(G) REBATE RATE ($/TON) (E + F)
REQUESTED REBATE* (A X G)
EQUIP #
(Example) AC 1
15.00
12.00
11.50
0.5
$2.50
$25
$27.50 $412.50
C
CHILLERS (BUILDING COOLING LOAD) — REBATE CODE: H4716, H4717, H4718, H4719, H4720, H4721, H4722, H4723, H4724, H4725, H4726, H4727, H4728, H4729, H4730, H4731, H4732, H4733, H4734, H4735
PAGE 26-27
BUILDING/SPACE DESIGN COOLING LOAD (TONS)
CODE COMPLIANCE PATH: A OR B
EQUIP TYPE
BASE OR TRIM CHILLER? CHILLER LOCKOUT TEMPERATURE (°F)
(Example) Air-Cooled
90
Base
53°F
Path A
D CHILLERS (EQUIPMENT PERFORMANCE) — REBATE CODE: H4716, H4717, H4718, H4719, H4720, H4721, H4722, H4723, H4724, H4725, H4726, H4727, H4728, H4729, H4730, H4731, H4732, H4733, H4734, H4735
PAGES 26-27
(D) MAX. PART LOAD (IPLV) (KW/TON) (FROM MEASURE DESCRIPTION PG 26–27)
(E) AHRI RATED PART LOAD EFFICIENCY (IPLV) (KW/TON, 3 DECIMALS)
(B) MAX. FULL LOAD (KW/TON) (FROM MEASURE DESCRIPTION PG 26–27)
(C) AHRI RATED FULL LOAD EFFICIENCY (KW/TON, 3 DECIMALS)
(A) AHRI RATED CAPACITY (TONS)
(I) REBATE RATE ($/TON) (G + H)
(F) DELTA EFFICIENCY ((B - C) + (D - E))
(G) ADDITIONAL REBATE ($/TON)
(H) BASE REBATE ($/TON)
REQUESTED REBATE* (A X I)
EQUIP #
(Example) Chiller 1
95
1.160
1.120
0.880
0.840
0.080
$10
$8
$18
$1,710
E ENERGY RECOVERY VENTILATORS (ERV) — REBATE CODE: H2314, H5082
PAGE 28
AHRI NET TOTAL SUMMER EFFECTIVENESS %
COOLING SYSTEM EFFICIENCY (KW/TON OR EER, 2 DECIMALS)
AHRI NET TOTAL WINTER EFFECTIVENESS %
HEATING SYSTEM EFFICIENCY (%)
HOURS OF OPERATION (HRS/WK)
SUPPLY AIRFLOW (AHRI LISTED CFM)
EQUIP #
(Example) ERV 1 60 hrs/wk
2,000
81%
77%
80%
1.20 kW/ton
10
Powered by FlippingBook