N
PRESSURE SCREEN ROTOR – REBATE CODE: PS2496
PAGE 20
HOURS OF OPERATION
VOLTAGE (IF AVAILABLE)
AVERAGE AMPS BEFORE (IF AVAILABLE)
AVERAGE AMPS AFTER (IF AVAILABLE)
REQUESTED REBATE*
HP INSTALLED
(Example) 6,000
480
150
100
150
$10,500
O REPULPER ROTOR AND EXTRACTION PLATE – REBATE CODE: PS2538, PS5210
PAGE 20
AVERAGE AMPS BEFORE (IF AVAILABLE)
AVERAGE AMPS AFTER (IF AVAILABLE)
HOURS OF OPERATION
VOLTAGE (IF AVAILABLE)
MEASURE
HP INSTALLED REQUESTED REBATE*
(Example) Repulper Rotor
8,000
2,300
110
90
500
$30,000
P
SPLINE ROTOR UPGRADE – REBATE CODE: PS4764
PAGE 20
AVERAGE CONNECTED REFINER HP
REFINER HOURS OF OPERATION
REQUESTED REBATE*
REFINER HP
% LOAD ON REFINER
85%
425
8,400
$20,000
(Example) 500
Q HIGH EFFICIENCY SIDE ENTRY AGITATOR – REBATE CODE: PS4763
PAGE 21
% MOTOR LOAD ON AGITATOR
AVERAGE CONNECTED AGITATOR HP
MOTOR HOURS OF OPERATION
REQUESTED REBATE*
AGITATOR MOTOR HP
(Example) 100
85%
85
8,400
$6,000
R INDUSTRIAL HIGH FREQUENCY BATTERY CHARGERS – REBATE CODE: PS4765
PAGE 21
HOURS PER YEAR EACH CHARGER IS IN MAINTENANCE MODE (WHEN A FULLY CHARGED BATTERY IS CONNECTED)
HOW DRAINED ( % USED) ARE THE BATTERIES WHEN PLUGGED INTO CHARGERS? (CHOOSE EITHER 40%, 80%, OR 100%)
HOURS PER YEAR EACH CHARGER IS IN NO BATTERY MODE (WHEN NO BATTERY IS CONNECTED)
NUMBER OF CHARGES PER WEEK PER CHARGER
(Example) 80%
7
365 hrs/year
2,920 hrs/yr = 8 hrs/day * 365 days/yr)
S
PROCESS EXHAUST FILTRATION – REBATE CODE: PS3244
PAGE 21
ANNUAL HOURS OF OPERATION
REDUCTION IN MAKE-UP CFM
REQUESTED REBATE*
DAYS/WEEK OPERATION HEATING SYSTEM EFFICIENCY
(Example) 6,000
5
95%
30,000
$30,000
* Focus on Energy may adjust total rebate based on project caps. See measure requirements and Terms and Conditions for more information.
11
Powered by FlippingBook