PROCESS AND SPECIALTY EQUIPMENT
RADIANT HEATER BANDS Requirements:
• Must be used on plastics equipment including injection molding, profile, and sheet extrusion and blow molding. • For replacement of standard conduction band heaters on plastic forming machine barrels with radiant barrel heaters. • Replacement of existing radiant heater bands with more efficient radiant heater bands may qualify for a custom incentive. • Rebate is limited to 50% of the project cost, including equipment and external labor. Application Measure Description Code Rebate Unit Retrofit Radiant Heater Band PS2490* $100 kW of existing heater bands New Construction Radiant Heater Band N-PS2490* $100 kW of conduction band heaters (standard efficiency technology) *Complete Table M on the Supplemental Data Sheet.
PRESSURE SCREEN ROTORS Requirements: • Rebate is limited to 50% of the project cost, including equipment and external labor. Application Measure Description Code
Rebate
Unit
Retrofit
Pressure Screen Rotor Pressure Screen Rotor
PS2496*
$70 $70
hp hp
New Construction
N-PS2496*
* Complete Table N on the Supplemental Data Sheet. Provide metered data if available. REPULPER ROTORS AND EXTRACTION PLATES Requirements: • Rebate is limited to 50% of the project cost, including equipment and external labor. • Rotor must operate at least 4,000 hours annually. Application Measure Description Code
Rebate
Unit
Repulper Rotor without Extraction Plate Repulper Rotor with Extraction Plate Repulper Rotor without Extraction Plate Repulper Rotor with Extraction Plate
PS2538* PS5210*
$60 $70 $60 $70
hp hp hp hp
Retrofit
N-PS2538* N-PS5210*
New Construction
* Complete Table O on the Supplemental Data Sheet.
SPLINE ROTOR UPGRADE FOR REFINERS Requirements: • Refiner must operate a minimum of 4,000 hours annually. • Rebate is limited to 50% of the project cost, including equipment and external labor. Application Measure Description Code
Rebate
Unit
Retrofit
Spline Rotor Upgrade Spline Rotor Upgrade
PS4764*
$40 $40
Refiner hp Refiner hp
New Construction
N-PS4764*
* Complete Table P on the Supplemental Data Sheet.
20
Powered by FlippingBook