2024 HVAC Catalog

BOILER CONTROLS AND BURNERS

GENERAL REQUIREMENTS: Only natural gas equipment is eligible for incentives. Equipment added to boilers fueled by electric, propane, or oil is NOT eligible for incentives. Equipment added to redundant or backup boilers does not qualify.

OUTSIDE AIR RESET/CUTOUT CONTROLS Requirements: • Outside air temperature boiler reset and cutout control incentives are for retrofit projects only. New boilers equipped with these controls do not qualify. • System must have an outdoor temperature sensor installed in a shaded location on the north side of the building. • System must be set up so the minimum temperature is less than 10°F above boiler manufacturer’s recommended minimum return temperature (unless unusual circumstances require a higher setting). • For controls on multiple boilers to qualify, control strategy must stage the lag boiler(s) only after the first boiler stage(s) fail to maintain the water temperature called for by the reset control. • Provide input capacity of boilers (in MBh) controlled with outside air reset and cutout controls per the example below. EQUIPMENT UPGRADES AND RETROFITS Measure Description Code Incentive Unit Outside Air Reset/Cutout Controls H2221 $70 Control

Outside Air Reset/Cutout Controls Example Use this example when applying for outside air reset/cutout controls which also requires boiler capacity in MBh. Reference this table when filling out SECTION 7 on the Incentive Application. EXAMPLE

TOTAL INCENTIVE (A X B)

INCENTIVE CODE

MANUFACTURER NAME

UNIT MEASURE

# OF UNITS (A)

INCENTIVE PER UNIT (B)

MODEL #

H2221

ABC Controls

OA1234

Control

1

$70

$70

--------

--------

Boiler Capacity MBh

500

--------

--------

11

Powered by